have already viewed this product
1
/
of
23
ZOOMNSTORE
Pet GPS Tracker - Bluetooth Dog Locator With Long Battery Life & Real Time Location
Pet GPS Tracker - Bluetooth Dog Locator With Long Battery Life & Real Time Location
Regular price
$13.99 USD
Regular price
$28.99 USD
Sale price
$13.99 USD
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Description
Description
SPECIFICATIONS
Battery Included: Yes
Battery Life: 30 Hours & Up
Choice: yes
Feature 1: Positioning record Function
Feature 2: Localizador GPS
Feature 3: Smart Child Tracker
Feature 4: Pet Tracker
High-concerned chemical: None
Is Smart Device: Yes
Model Number: no
semi_Choice: yes
Product use Description:
1. Bluetooth connecting, bluetooth v4.0 EDR communication protocal could connect 4 anti-lost devices at the same time.
2. Powerful function, both-way junction(smartphone & anti-lost devices could control each other).
3. Extraordinary working hours, our devices have ability to work about 6 monthes by 3V CR2032 button battery power supply, don't need to replace the batteries frequently.
4. Intelligent alarm, when the anti-lost device exceeds the set bluetooth range, the mobile phone and the anti-lost device will alarm at the same time; when the anti-lost device is disconnected,the map location can be checked on the mobile phone.
5. Anti-nuisance function, it can be set to mute for a certain period of time to prevent interruption during work and other important times;
Specifications:
Compatible system: Apple IOS 9.0 or above / Android 9.0 and Bluetooth 4.0 or above.
Communication Protocol: Bluetooth v4.0 EDR.
Multi Task Management: one smart phone could manage up to 4 anti lost devices at the same time.
Working Distance: about 50 m.
Battery Efficiency: CR2032 button battery, lasting up to six months.
App Voice: English
The product APP can be downloaded for free by scanning the QR code or finding
iSearching
in the Apple/Android system store.
1. Bluetooth connecting, bluetooth v4.0 EDR communication protocal could connect 4 anti-lost devices at the same time.
2. Powerful function, both-way junction(smartphone & anti-lost devices could control each other).
3. Extraordinary working hours, our devices have ability to work about 6 monthes by 3V CR2032 button battery power supply, don't need to replace the batteries frequently.
4. Intelligent alarm, when the anti-lost device exceeds the set bluetooth range, the mobile phone and the anti-lost device will alarm at the same time; when the anti-lost device is disconnected,the map location can be checked on the mobile phone.
5. Anti-nuisance function, it can be set to mute for a certain period of time to prevent interruption during work and other important times;
Specifications:
Compatible system: Apple IOS 9.0 or above / Android 9.0 and Bluetooth 4.0 or above.
Communication Protocol: Bluetooth v4.0 EDR.
Multi Task Management: one smart phone could manage up to 4 anti lost devices at the same time.
Working Distance: about 50 m.
Battery Efficiency: CR2032 button battery, lasting up to six months.
App Voice: English
The product APP can be downloaded for free by scanning the QR code or finding
iSearching
in the Apple/Android system store.
Couldn't load pickup availability
Share
🔥
In Stock
