have already viewed this product
1
/
of
18
ZOOMNSTORE
Pet GPS Tracker – Waterproof Dog & Cat Collar with LED Light, Real-Time Location
Pet GPS Tracker – Waterproof Dog & Cat Collar with LED Light, Real-Time Location
Regular price
$53.99 USD
Regular price
$118.99 USD
Sale price
$53.99 USD
Unit price
/
per
Taxes included.
Shipping calculated at checkout.
Description
Description
SPECIFICATIONS
Battery Included: No,Yes
Battery Life: 30 Hours & Up
Brand Name: Shunmaii
Choice: yes
Color: Black/White(Optional)
High-concerned chemical: None
Is Smart Device: Yes
Material: plastic
Model Number: GPS Tracker for Dogs
Package: color box
Size: length 45 width 33 height 10 mm/1.7*1.3*0.4in
|
GPS Tracker for Dogs Pet GPS Location Tracker Works with Any Collar Real-Time Global Location Tracker with LED Light Up Bluetooth-Compatible Locator for Cats
Feature: 1. Versatile Usage & Quick Locating: GPS tracker is perfect for a wide range of scenarios and can be quickly located in any situation, making it an essential tool for keeping track of your personal belongings, pets, or anything else you want to keep an eye on. 2. Lightweight & Comfortable: Crafted using innovative materials, pet GPS location tracker weighs only 25g and is designed to be comfortably worn without causing any discomfort. Its compact and unobtrusive design ensures that it doesn't become a burden. 3. Remarkable Waterproof: Smart activity tracker is rated at P65 for water resistance, providing robust protection against water splashes and rain. This makes it highly reliable even in wet conditions. 4. Extended Battery Life & Privacy Protection: Enjoy an impressive standby time of 365 days without needing to change the battery. GPS pet tracker respects your privacy, with built-in features ensuring that only you can see its location. Moreover, every step of the location data is encrypted for added security. 5. & Sound-Light Indicators: If someone tries to track you with a real-time global location tracker, your phone will detect it and send you an alert. If you can't find the tag after a while, it will start playing a sound to reveal its location. Specification: Material: plastic Package: color box Size: length 45 width 33 height 10 mm/1.7*1.3*0.4in Color: Black/White(Optional) Note: Due to the different monitor and light effect, the actual color of the item might be slightly different from the color showed on the pictures. Thank you! Please allow 1-2cm measuring deviation due to manual measurement.
1 x GPS Tracker
|
Couldn't load pickup availability
Share
🔥
In Stock